BIM coordination
NMHH EMC Lab – BIM documentation
Full drone and laser survey of an existing industrial lab, followed by an IFC-based BIM model and CDE integration.
Result
Millimetre-accurate as-built survey · complete IFC export · design lead time cut by ~30%.
Why it matters
The client works from a single, reliable digital source – fewer site visits, fewer design errors, faster construction.