WHAT WE DO NOT MEASURE,
WE CANNOT
CONTROL.
The costliest mistakes in general contracting come not from technology but from missing information. Loricatus closes that gap with engineering data services: laser scanning, drone surveying, BIM and AI-assisted analysis in a single workflow.
SIX POINTS WHERE LARGE PROJECTS LOSE MONEY
These are not one company's problems: they run through general contracting as a whole, and they all share a single root — data about reality arrives late, incomplete or in a disputable form.
Disputed progress levels
Monthly valuation rests on estimates and site walks. Any discrepancy between client, main contractor and subcontractor means weeks of negotiation and withheld payment.
Deviations spotted too late
A misplaced penetration or structural element surfaces only once it has been covered up. Fixing it costs orders of magnitude more than the survey that would have prevented it.
Earthworks and material quantities
Excavated and placed volumes are billed from delivery notes and cross sections. The actual volume of stockpiles is rarely verified against independent data.
High-risk manual inspection
Inspecting roofs, façades and tall structures requires scaffolding, rope access or a lift — safety risk, permitting and downtime all at once.
Proving subcontractor performance
In a dispute it is photographs against memory. There is no time-stamped, geometrically reliable record of the state of works to fall back on.
As-built documentation
The as-built dataset requested at handover is often reconstructed afterwards from memory. The model handed to the operator therefore does not describe what was actually built.
MEASURABLE DATA FOR EVERY CHALLENGE
WHAT THIS LOOKS LIKE IN PRACTICE
PROGRESS AND VALUATION
Before every valuation cycle the survey follows the same methodology, so cycles remain comparable. Registering the point cloud to the design model shows element by element what has been built and what has not.
DEVIATION ANALYSIS
The difference between the built structure and the design model appears on a colour-coded map. Deviations can be read in millimetres, with critical points listed.
VOLUME CALCULATION
Drone photogrammetry with RTK correction: excavated or placed volume is computed directly from the difference between two terrain models.
RISK-FREE INSPECTION
Surveying façades, roof structures and tall structures without human entry. Where scaffolding or rope access used to be required, a flight plan and a licensed pilot now do the work.
STATE RECORDING
Time-stamped, geo-referenced imagery and a point cloud from every cycle. In a dispute you can cite measurement data instead of memory.
AS-BUILT MODEL
The as-built model is not produced from memory at the end of the project; it grows continuously from data collected during construction.
FOUR STEPS, IN A REPEATABLE CYCLE
Data capture
Drone flights, terrestrial laser scanning, GNSS control points. Site work does not stop construction.
Processing
Producing the point cloud, orthophoto and 3D terrain model. Office processing runs independently of the site.
Analysis
Comparison with the design model, volume calculation, AI-assisted analysis. The output is a decision recommendation, not raw data.
Handover
Report, model and survey dataset in the project's format. The next cycle builds on the same basis.
ONE DATA LAYER
ACROSS THE ENTIRE
PROJECT LIFECYCLE.
From tender pricing to operational handover, the same geometric basis follows the project. Captured once, reused in every phase — Scan, Drone, BIM and AI in a single service.
TENDER AND PREPARATION
A bid carries exactly as much risk as there is uncertainty about the initial state.
CONSTRUCTION
This is where the project's outcome is decided. Construction monitoring in repeating cycles.
HANDOVER
Documentation is not an afterthought; it is a by-product of the process.
OPERATION
Once the project closes, the data can still be maintained as a service.
THREE ENTRY POINTS
One-off survey
One specific question, one site visit, one closed result. The simplest way to get to know us.
Construction monitoring on one project
Fixed-cycle surveys and reports on a selected site, throughout the whole construction period.
Framework agreement
A single methodology and data format across several projects, on terms agreed in advance.
WHAT WE HAVE ALREADY MEASURED
Heritage façade
Restoration survey: the wall surface and joints documented centimetre by centimetre, so that specialists can design the repairs and replacement elements on a 3D model.
Mining extraction
On-site data capture and processing. Regular remote evaluation of extracted volumes.
Construction monitoring
Regular surveys of ongoing construction, so the building takes shape according to the client's design.