Narrative
Introduction · for general contractors · 2026

WHAT WE DO NOT MEASURE,
WE CANNOT
CONTROL.

The costliest mistakes in general contracting come not from technology but from missing information. Loricatus closes that gap with engineering data services: laser scanning, drone surveying, BIM and AI-assisted analysis in a single workflow.

Point cloud · 3D model · Verified progress
01 · Industry challenges

SIX POINTS WHERE LARGE PROJECTS LOSE MONEY

These are not one company's problems: they run through general contracting as a whole, and they all share a single root — data about reality arrives late, incomplete or in a disputable form.

01

Disputed progress levels

Monthly valuation rests on estimates and site walks. Any discrepancy between client, main contractor and subcontractor means weeks of negotiation and withheld payment.

02

Deviations spotted too late

A misplaced penetration or structural element surfaces only once it has been covered up. Fixing it costs orders of magnitude more than the survey that would have prevented it.

03

Earthworks and material quantities

Excavated and placed volumes are billed from delivery notes and cross sections. The actual volume of stockpiles is rarely verified against independent data.

04

High-risk manual inspection

Inspecting roofs, façades and tall structures requires scaffolding, rope access or a lift — safety risk, permitting and downtime all at once.

05

Proving subcontractor performance

In a dispute it is photographs against memory. There is no time-stamped, geometrically reliable record of the state of works to fall back on.

06

As-built documentation

The as-built dataset requested at handover is often reconstructed afterwards from memory. The model handed to the operator therefore does not describe what was actually built.

02 · The answer

MEASURABLE DATA FOR EVERY CHALLENGE

Progress · valuation
Scheduled drone flights and laser scanning in every valuation cycle. Actual progress computed from the point cloud and measured against the design model — not an estimate, but geometric evidence.
Deviation analysis
Scan-to-BIM comparison: the difference between the built structure and the design model on a colour-coded deviation map. The error shows up before anything is covered.
Volume calculation
Drone photogrammetry with RTK correction: 3D terrain model, stockpile and cubature calculation between two dates. Independent data alongside the delivery notes.
Risk-free inspection
Surveying façades, roofs and structures without anyone having to climb. Where rope access used to be needed, there is now a flight plan and a licensed pilot.
State recording
Time-stamped, geo-referenced imagery and a point cloud from every cycle. A searchable reference base for disputes with subcontractors and clients alike.
As-built model
What is handed over at the end of the project is not a model reconstructed afterwards, but one built continuously during construction.
03 · Details

WHAT THIS LOOKS LIKE IN PRACTICE

01

PROGRESS AND VALUATION

Before every valuation cycle the survey follows the same methodology, so cycles remain comparable. Registering the point cloud to the design model shows element by element what has been built and what has not.

Fixed flight paths, repeatable data capture
Element-level progress following the BIM model structure
A report to accompany the progress certificate
Progress between cycles expressed in numbers
02

DEVIATION ANALYSIS

The difference between the built structure and the design model appears on a colour-coded map. Deviations can be read in millimetres, with critical points listed.

Scan-to-BIM registration in a shared coordinate system
Automatic flagging of out-of-tolerance elements
Checking penetrations, protrusions and out-of-plane deviations
The error surfaces before covering up, while it can still be fixed
03

VOLUME CALCULATION

Drone photogrammetry with RTK correction: excavated or placed volume is computed directly from the difference between two terrain models.

Volume of stockpiles and excavations
Difference model between two dates
Independent verification alongside delivery notes
Evidence for monthly quantity valuation
04

RISK-FREE INSPECTION

Surveying façades, roof structures and tall structures without human entry. Where scaffolding or rope access used to be required, a flight plan and a licensed pilot now do the work.

No work at height, no risk of falling
No scaffolding cost and no downtime
High-resolution detail imagery of defective surfaces
Repeatable, from the very same position
05

STATE RECORDING

Time-stamped, geo-referenced imagery and a point cloud from every cycle. In a dispute you can cite measurement data instead of memory.

Every capture carries a date and position stamp
A searchable archive covering the whole project
Documented proof of subcontractor performance
Zero state recorded at site handover
06

AS-BUILT MODEL

The as-built model is not produced from memory at the end of the project; it grows continuously from data collected during construction.

Continuously updated, not reconstructed afterwards
The operator receives what was actually built
Base data for later refurbishment and extension
Handover in the format the client requires
04 · Process

FOUR STEPS, IN A REPEATABLE CYCLE

01

Data capture

Drone flights, terrestrial laser scanning, GNSS control points. Site work does not stop construction.

02

Processing

Producing the point cloud, orthophoto and 3D terrain model. Office processing runs independently of the site.

03

Analysis

Comparison with the design model, volume calculation, AI-assisted analysis. The output is a decision recommendation, not raw data.

04

Handover

Report, model and survey dataset in the project's format. The next cycle builds on the same basis.

Case studies

WHAT WE HAVE ALREADY MEASURED

Heritage façade

Restoration survey: the wall surface and joints documented centimetre by centimetre, so that specialists can design the repairs and replacement elements on a 3D model.

Mining extraction 

On-site data capture and processing. Regular remote evaluation of extracted volumes.

Construction monitoring

Regular surveys of ongoing construction, so the building takes shape according to the client's design.

How we work

SEVEN THINGS YOU CAN COUNT ON

01
Innovative technology
02
Compliant execution
03
Supportive attitude
04
Personal accountability
05
Orderly work
06
Service mindset
07
Measurable performance
Our suggestion

LET'S START WITH A DEMO TOGETHER

A one-hour session where we demonstrate what measurement can do, using data from one of your live projects. No obligation — any questions that come up we settle on the spot.

E-MAIL
info@loricatus.hu
PHONE
+36 20 493 1222
BUDAPEST
27/B Logodi utca, 1012 Budapest 
MILAN
Via Maria Bianca 13.
LORICATUS LTD. · BIM · SCAN · DRONE · AI